Concept Japanese night city with abstract power and data connections

AIGEXENERGY PORTFOLIOS × MARKET COORDINATION

From power demand to trading decisions

AIGEX connects demand, supply portfolios and market operations for clearer energy decisions and execution workflows.

The platform is for authorized users only. After signing in, access is determined by your account permissions.

Concept image · Not a real customer, installation or operating interface

Clear workflows. Explicit boundaries.

This is a marketing and synthetic demonstration page. AIGEX does not provide a licensed exchange or official Japanese market-operator service here. No live connection to JEPX, EPRX or OCCTO is claimed, and no real orders are executed. The demonstration guarantees neither settlement, returns, savings nor earnings.

01 / AIGEX

Coordination goes beyond balancing supply and demand

Connecting enterprise needs to operation records takes shared information and explicit responsibilities.

Concept urban electricity infrastructure and buildings
Concept image · Not a real customer, installation or operating interface

01Fragmented information

Load, contracts and market information sit in different systems, making like-for-like comparison difficult.

02Misaligned timing

Demand and supply follow different time profiles. Total volumes alone cannot reveal gaps at each point.

03Complex flexibility planning

Storage and flexible loads require equipment constraints, availability and authorization to be considered together.

04Disconnected records

Inconsistent references across steps complicate delivery, settlement evidence and reconciliation tracing.

02 / AIGEX

Connect information and responsibility through the workflow

Four coordination modules connect demand, resources, operations and evidence. Their outputs are plans or illustrative records, not production promises.

01 → 02

Demand / PPA & supply matching

Input
Load profiles, procurement goals and contract terms
Purpose
Compare timing, portfolios and uncovered demand
Output
Draft portfolio comparisons and demand matching
Capability boundary
Planning concept; suitability and contracts require project validation
02 → 03

Generation, storage & load flexibility

Input
Resource profiles, capacity, availability and equipment limits
Purpose
Review participation conditions and resource interactions
Output
Conditional resource plans and constraint lists
Capability boundary
Not autonomous equipment control; compatibility and authorization require validation
03 → 04

Market operations demo

Input
Draft plans, roles and simulated operation conditions
Purpose
Illustrate order review, trade records and delivery coordination
Output
Illustrative review records and delivery checklists
Capability boundary
Demo only; no real orders, trades or market connections
04 → 01

Settlement evidence & reconciliation

Input
Metering, contracts and illustrative delivery references
Purpose
Organize differences, evidence links and open items
Output
Illustrative reconciliation lists and record indexes
Capability boundary
Not formal settlement or compliance assurance; responsible parties must confirm

03 / AIGEX

See how each step informs the next

Switch three scenarios and seven stages to see fixed data become planning and operation references.

Fixed synthetic concept examples · Not live information, a quote or real trades. No orders are submitted here.

Start with enterprise demand and compare the renewable profile with the remaining planning gap.

Demand560kW
Renewables360kW
Net storage discharge0kW
Residual demand200kW
Storage state of charge50%

Illustrative daily power profiles

DemandRenewablesResidual demand
Fixed synthetic daily power snapshots: demand in solid cyan, renewables in solid green, residual demand in a light dashed line; units kW, exact values in the snapshot table020040060000040812162024

Power is in kW; state of charge is in %. Times represent illustrative Japan local time. Seven sparse snapshots are not settlement intervals and are not summed into energy totals. Residual demand = demand − renewables − net storage discharge; negative storage means charging. State of charge is independently specified, not integrated from sparse points. No price, earnings or executed-market assumptions.

View exact power snapshots
Inspection timeDemand (kW)Renewables (kW)Net storage discharge (kW)Residual demand (kW)Storage state of charge (%)
00:0032060026050
04:0030050025050
08:00480180030050
12:00560360020050
16:00600210039050
20:0044080036050
24:0032060026050

Workflow stage

Demand concept · Unconfirmed

Enterprise demand / Demand / 12:00

Input
Enterprise load and procurement draft · Load and role data · 560 kW / 360 kW
Purpose
Clarify demand timing, data scope and roles · Residual demand 200 kW
Output
Draft demand reference · Enterprise demand-gap planning reference

If a project uses 15-minute or CFE granularity, it is analysis only, not a Japanese market settlement period.

Fixed synthetic concept examples · Not live information, a quote or real trades. No orders are submitted here.

04 / AIGEX

Distinct roles in Japan’s energy ecosystem

Operations depend on each participant’s data and responsibilities, not on a platform automatically acquiring market authority.

Enterprise & AI data center demand

Contribute load profiles, procurement objectives and operational constraints.

Generation & storage

Provide resource characteristics, availability and equipment constraints.

Retailers & aggregators

Confirm market-operation and delivery responsibilities within qualifications, rules and contract scope.

Concept landscape of renewable generation and battery storage
Concept image · Not a real customer, installation or operating interface

Demand-side data meets portfolio coordination

AIEDC (AI-EDC on this site) focuses on demand-side energy-operation data and decision support. AIGEX focuses on portfolio and market-coordination concepts. The roles complement each other, while integration, data use and formal execution still require project validation and authorization.

Explore the AI-EDC platform

05 / AIGEX

Understand first. Validate next. Confirm scope.

  1. 01

    Confirm needs

    Clarify goals, scenarios and expected responsibilities.

  2. 02

    Data & roles

    Confirm data permissions, quality and participant roles.

  3. 03

    Demonstration

    Explore workflows with synthetic data.

  4. 04

    Project validation

    Review compatibility, applicable rules and feasible scope.

  5. 05

    Formal eligibility & contracts

    Responsible parties confirm qualifications, responsibilities and contracts. Onboarding does not authorize live trading.

Concept unoccupied energy operations center, not a live trading interface
Concept image · Not a real customer, installation or operating interface

06 / AIGEX

AIGEX, explained

How does AIGEX relate to AIEDC?

AIEDC (AI-EDC) centers on demand-side operation data. This AIGEX page illustrates portfolio planning and market workflow coordination, not verified live-trading integration.

Does the demo place real orders?

No. Curves, order reviews and trade records are fixed synthetic concepts. There is no market connection, order submission, trade or settlement.

What prerequisites and responsibilities apply?

Applicable rules, participant qualifications, data permissions, equipment compatibility and contract scope must be confirmed. Responsible parties confirm execution responsibilities; neither a demo nor onboarding provides authorization.

Where does the demonstration data come from?

Fixed synthetic data authored for this site’s concept demonstration. It contains no private customer data, live market prices or reference-app data. It is not a quote, earnings estimate or verified result.

KiWi New Energy / AIGEX

A clearer starting point for your next energy decision

Begin with needs, data and roles. Together, define an appropriate demonstration and project-validation scope.

The platform is for authorized users only. After signing in, access is determined by your account permissions.