Owner
Holds assets or relevant rights, with contractual rights and obligations.

Grounded in sites. Connected by records.
Grounded in physical energy sites, connecting construction, monitoring and long-term asset management.
Genuine field photograph with restrained exposure and color adjustment; specific site unconfirmed. Not identified as Decathlon or the Taoyuan project.
Traceable information connects engineering, equipment and operating records, from assessment to long-term management. This page presents services and project participation, not an investment solicitation, ownership claim or evidence that all projects are operating.
01
Each stage is verified against the project scope and available evidence. Not every project has completed every stage.
Establish site conditions, data availability and responsibility boundaries.
Site survey, preliminary layout and open-issue register.
Coordinate the agreed design and check equipment and test evidence.
Equipment inventory, test records and acceptance documents.
Track equipment condition and connect alerts with on-site action.
Monitoring records, work orders and action follow-through.
Align metering periods, contracts and actual income and expense sources.
Generation records, income evidence and period reconciliation.
Review improvement needs against technical condition and responsibilities.
Equipment-health review, improvement plan and updated assumptions.
Holds assets or relevant rights, with contractual rights and obligations.
Delivers the agreed engineering, installation and acceptance scope.
Tracks equipment and operating records within the authorized service scope.
Owner, contractor and manager/operator are not automatically the same party. Project participation does not establish KiWi ownership.
02
A retail rooftop project in planning, alongside a public-facility rooftop system with construction, testing and monitoring evidence.

Commercial retail rooftop · Planning & coordination
KiWi participates in commercial retail rooftop solar planning and project coordination. Completed construction, commissioning and commercial operation are not established, so no capacity, site count or progress figures are presented.
Existing green-power procurement cooperation is a separate scope, not proof of rooftop PV ownership or completion.

Luzhu District, Taoyuan · Rooftop photovoltaic system
Source capacity is 275.11 kWp, rounded to one decimal as 275.1 kWp.
The June 10, 2026 completion report records installed equipment, system testing, meter installation/grid parallel connection and Taipower completion inspection. This dated construction evidence does not unconditionally establish commercial operation; a platform installation date is not a commercial operation date.
KiWi’s documented role is construction contractor. Ongoing management services are this page’s scope; completed handover, transfer, lease and subsequent operating arrangements are not confirmed.
03
A qualitative mechanism explanation, not a financial model or investment-return estimate. Equal-weight nodes convey no amounts, proportions or results.
Project-specific financial outcomes depend on actual contracts, costs, financing, tax and operating conditions. The calculator below compares only scenarios you enter, in nominal pre-tax annual TWD; no return is guaranteed.
Investment calculator
Compare a simplified scenario built only from the assumptions you enter. Values stay in this browser tab’s memory and are never sent, saved or added to the address.
No example values are preloaded. Fill in the required fields — including costs and degradation, even when 0 — to see charts and the annual table.
Required fields still blank:
Nominal TWD, pre-tax, annual end-of-year flows; all capex at t=0; full years only. Excludes tax, subsidies, REC income, construction-period flows, fees, grace periods, decommissioning, terminal or residual value, tax shields and refinancing.
This is a simplified comparison of your own assumptions, not an actual customer return, guaranteed yield, or investment or tax advice. Real outcomes depend on weather, equipment availability, curtailment, contract and counterparty terms, grid and regulatory changes, costs and operations. Consult qualified professionals.
04
Retain sources, periods and versions; align meter, equipment, contract and accounting records.
Connect alerts with work orders, responsible parties and action records; follow unresolved items.
Review weather, equipment availability and technical condition together, without treating short-term variation as long-term performance.
Clarify contractual scope and review cost, operational and data assumptions. Do not treat unconfirmed items as completed.
No. Ownership, construction and management roles must be confirmed separately against project rights and service arrangements.
The Decathlon rooftop project is in planning/preparation. Taoyuan has a June 10, 2026 completion report and monitoring data; these do not directly confirm commercial operation.
It compares scenarios built only from your own inputs, as nominal pre-tax annual TWD cash flows. No example values, customer figures or guaranteed returns are included, and tax, subsidies and other omitted factors are disclosed beside the results.
Site and role descriptions, equipment and metering data, project stage, contractual responsibilities and management questions. No private documents need to be submitted on this page.
Start with site conditions, project stage and responsibilities to discuss suitable construction or management services.